A new 270 kW Siapro hydroelectric power plant is now operating in Japan

A new hydroelectric power plant has recently become operational in Japan, equipped with a Siapro crossflow turbine and a patented flow control system. This innovative solution increases the turbine’s efficiency by up to 5%, enabling more effective conversion of water energy into electricity. The new technology is based on the well-proven Banki (crossflow) turbine, renowned for its robustness, reliability, and long service life.

The system offers numerous advantages, including higher efficiency, low operating costs, and easy maintenance. The patented flow control ensures optimal turbine performance even under varying flow conditions, enhancing the stability of electricity production. This new hydroelectric plant represents a significant step forward in sustainable energy generation, demonstrating how modern technologies can improve traditional hydroelectric systems.

The Siapro Group brings together companies with many years of experience in hydropower, mechanical engineering, and shot blasting.

SIAPRO d.o.o.
Station 9
5216 BRIDGE ON THE SOCHI
Slovenia

Subscribe to Our Newsletter
Be among the first to receive updates about our projects, solutions, and the latest developments within the SIAPRO Group and the industries we operate in.
Location
© 2025 SIAPRO Group - All rights reserved